Planning Scenario: Dairy Barn with a Long Feeding Alley
Last updated: 2026-11-08

This planning scenario uses a 60 × 24 m dairy barn as its input: a long feeding alley runs down the building, stalls line both sides, and the air inside is humid and carries ammonia from the animals and bedding. This is a planning scenario, not a project record: it shows how the selection answer is reached and what an engineering review still has to confirm.
What constraints do the alley, the stalls and the barn air set?
- The building is organised by the feeding alley and the stall rows, so positions follow that layout, not the roof grid alone.
- Humid, ammonia-bearing air is the daily operating environment, so corrosion and environment checks are a first-order part of the review.
- Animals and staff occupy the stalls and the alley for long periods, while feed equipment uses the alley itself.
- Barn roof structure is often light, so the mounting structure at each position has to be confirmed, not assumed.
- Clear height varies along a barn — over the alley, over the stalls and under any cross beams or services.
- Feed delivery, bedding work and cleaning change how the alley is used across the day, and positions have to fit that use.
The selection answer
Start the review with the 7.3 m class, named model King RTF-CF-7EEX, planned over the feeding alley and the stall rows. It is the starting point because this scenario pairs a long, large-volume barn with the joint-highest rated airflow in the verified RTFANS range, and its gear-drive build is the class the review tests first for this layout. The wider application method behind this scenario is set out on the applications page.
| Item | King RTF-CF-7EEX |
|---|---|
| Drive | NORD gear motor |
| Blades | 6 |
| Diameter | 7.3 m (24 ft) |
| Max airflow | 15,500 m³/min |
| Input power | 1.5 kW |
| Noise | 43 dBA |
| Weight | 135 kg |
Placement logic follows the barn’s working layout. Positions are planned along the feeding alley and over the stalls, then checked against roof structure, clear height and alley equipment before any grid is fixed. Compare this starting point with the other series on the model selection page before the review closes.
This page states no fan quantity. Quantity, final positions and mounting heights are outputs of an engineering review of the barn drawings, not of a scenario — the barn dimensions above are the scenario’s input, not a sizing result.
What must still be verified
- Corrosion and environment checks for humid, ammonia-bearing air: materials, coatings, fasteners and motor and electrical details, each confirmed against the selected model’s documentation before the selection is final.
- The roof structure at each mounting point, checked for the fan’s 135 kg weight and its operating loads.
- Clear height over the feeding alley and over the stalls at each candidate position.
- Clearances from feed equipment, alley traffic and any beams, pipes or services crossing the barn.
- The electrical supply in a humid barn environment, checked against the model’s published 220/380 V rating and its installation requirements.
- Cleaning and inspection access at each position, and the inspection schedule for this environment.
- The barn layout as built: alley width, stall arrangement and any planned change to either.
FAQ
Why plan positions along the feeding alley?
Because the alley and the stall rows are where the animals and staff are, and they organise the whole building. A grid drawn only from the roof ignores the layout the air has to serve, so the review starts from the alley and stalls.
Does ammonia in the air rule this model out?
Ammonia does not settle the choice either way on its own. It makes the corrosion and environment checks decisive: the review confirms materials, fasteners and electrical details against the model’s documentation, and the selection is not final until those checks pass.
Why start with the King class for a barn?
The King is the 7.3 m gear-drive model with a rated airflow of 15,500 m³/min, the joint-highest in the range. For a long, large-volume barn that makes it the class to test first in review — subject to the structure and environment checks above.